Connecting to a sewer

outline2025年-outline

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

outline2025年-outline

outline2025年-outline

免费服务器节点官网,免费服务器节点电脑版下载,免费服务器节点vp,免费服务器节点vqn  羚羊加速器破解版,羚羊加速器安卓下载,羚羊加速器vqn,羚羊加速器vp  飞马加速器破解版,飞马加速器mac下载,飞马加速器vnp,飞马加速器免费永久加速  猴王加速器ios下载,猴王加速器免费永久加速,猴王加速器免费试用,猴王加速器不能用了  壁虎加速器官方网址,壁虎加速器vp,壁虎加速器vqn,壁虎加速器vps  pixiv加速器破解版,pixiv加速器下载地址,pixiv加速器pc版下载,pixiv加速器vn  鹰眼加速器官网,鹰眼加速器官方网址,鹰眼加速器ios下载,鹰眼加速器pc版下载  Armios下载,Arm电脑版下载,Arm2025,Armvpm